Everything also feels like pure exhaustion, and something like terror. Between yesterday and today, our crew accomplished so much more than we ever thought possible that we're way ahead of where we expected to be right now.
Which means, of course, more and greater financial outlays much earlier than expected.
This was the beginning of our day:
Photo copyright Aji, 2016; all rights reserved. |
At any rate, while these two guys pick-and-shoveled the line and installed the conduit, our builder and his helpers got to work on the pad. He had also arranged to rent a roller (and driver!) for two hours for one very modest lump sum, and here he and the roller operator are busy with the base course:
Photo copyright Aji, 2016; all rights reserved. |
Meanwhile, one his other guys was at work with the lumber, cutting batter boards. Yes, it's a whole new language. Wings has the hang of it much better than I:
Photo copyright Aji, 2016; all rights reserved. |
Photo copyright Aji, 2016; all rights reserved. |
In the meantime, the guy from the gravel company bumped us up ahead of some others to deliver [I hope] the last load of base course:
Photo copyright Aji, 2016; all rights reserved. |
Photo copyright Aji, 2016; all rights reserved. |
Photo copyright Aji, 2016; all rights reserved. |
Photo copyright Aji, 2016; all rights reserved. |
Photo copyright Aji, 2016; all rights reserved. |
But we have a packed week ahead. On Monday, we're supposed to put $2K down on the plumbing materials for the house itself, and probably another $2K on foundation materials and adobes. Monday they hope to spend on the footing; Tuesday on the rebar; and they're talking about having the pallets of adobe brick here potentially as early as Wednesday. We'll need to come up with another $6K to get the plumbing roughed in, and that will need to happen pretty soon, too.
Rather than extend the life of this particular stage of the YouCaring fundraiser, we're going to try our best to close it out in the days to come. Once that happens, we'll calculate what's needed for the next stages, including the plumbing (very expensive, even before we get to the septic system that has to be completely replaced and relocated). The good thing is that we have confidence in every single person on the job, and it's all being done right.
So here's where I ask everybody to share the link to our YouCaring page again. Tomorrow I'm going to try and see if it'll let me put up a new photo, one that shows what it looks like now. But for now, this is the widget we've got, and I hope everyone will use the page widgets when sharing.
We need another $6K to close this one out, and then we'll see where we are in terms of needs for the next round of materials and labor.
Thank you to everyone for your help thus far, from both of us. I'll likely have more updates tomorrow.